UKDN Waterflow (LG) Ltd achieves full PCL status

UKDN Waterflow (LG) Ltd has been granted full PCL status and has marked the occasion by winning an extension to a multi-route infrastructure maintenance contract. The company, part of Lanes Group plc, achieved a provisional PCL (Principal Contractor Licence) 12 months ago. Since then, it has significantly grown its drainage maintenance services for Network Rail. […]

Catch Pit 3D

What is a catch pit?

A catch pit is an empty chamber that is installed into a drainage system to prevent silt and debris from building up and causing blockages. Wastewater flows into the catch pit through an inlet pipe that is always raised above the floor level of the pit. Any sediment in the wastewater will settle at the […]

Interceptor & Septictank

What is an interceptor?

A 2 stage interceptor, otherwise known as a separator, is a filter system put in place to separate common oils and contaminants from wastewater before it enters the main sewage system. These pollutants are then stored in the interceptor before being periodically removed. Wastewater enters into the first chamber of the interceptor through an inlet. […]